Claim and evidence Close ×
Stargate Project planned capacity for ↓ Stargate (five new sites, Abilene and CoreWeave projects, combined) The September 2025 release stated that the five new sites, the Abilene site and ongoing CoreWeave projects together bring Stargate to "nearly 7 gigawatts of planned capacity and over $400 billion in investment over the next three years". Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source
Date 2025-09-23 · announcement Figure measures not stated by the source Transaction type compute capacity Relationship context external Stage planned Amount more than · $400,000,000,000 programme Quantity approximate · 7 GW (as worded: "nearly 7 gigawatts of planned capacity") Scope and limits An aggregate of planned capacity and investment as stated by the release; it is not built capacity, and it includes CoreWeave projects that are not sites of the Stargate venture as such. The release also says this puts Stargate on a path to its 10-gigawatt, $500 billion commitment by the end of 2025: a projection.
The evidence 02 primary source Supports the claim
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites ↗ SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group) · 2025-09-23
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “nearly 7 gigawatts of planned capacity and over $400 billion in investment” Location in source paragraph 1
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 1a993c3440862bb1f2157560f56f5df305cbf48be9346370ebd9be533d635d93). Press release page as served on 2026-10-28; dated "September 24, 2025 (Texas, September 23, 2025)" and attributed to OpenAI, Oracle and SoftBank Group Corp. OpenAI's own post (openai.com/index/five-new-stargate-sites/) refused retrieval; the cross-family checker should open it or its capture and compare. Retrieved again at admission on 2026-10-30 (SHA-256 a3d77f8db28800481eac9625ed0caf759b0f12015cf3b6f9f139cd330cc28292). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group), “OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites”, 2025-09-23. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (12 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 a3d77f8db28800481eac9625ed0caf759b0f12015cf3b6f9f139cd330cc28292; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 19) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites ↗ SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group) · 2025-09-23
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase the aggregate is of the combined capacity of the five new sites, the flagship Abilene site and ongoing projects with CoreWeave; the release says this puts it on a path to securing the full $500 billion, 10-gigawatt commitment announced in January by the end of 2025.
Location in source paragraph 1
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 1a993c3440862bb1f2157560f56f5df305cbf48be9346370ebd9be533d635d93). Press release page as served on 2026-10-28; dated "September 24, 2025 (Texas, September 23, 2025)" and attributed to OpenAI, Oracle and SoftBank Group Corp. OpenAI's own post (openai.com/index/five-new-stargate-sites/) refused retrieval; the cross-family checker should open it or its capture and compare. Retrieved again at admission on 2026-10-30 (SHA-256 a3d77f8db28800481eac9625ed0caf759b0f12015cf3b6f9f139cd330cc28292). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution SoftBank Group Corp. (joint release of OpenAI, Oracle and SoftBank Group), “OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites”, 2025-09-23. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The paraphrase is Selekoa’s, written from the text retrieved for the candidate pack on 2026-10-28; it is not a quotation and was not machine-matched. The cross-family check found it faithful. A cross-family machine check (2026-10-29/30, item 19) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. Planned capacity of an identified compute asset or, from schema 2.21, of a group of sites a source states together (a literal naming the group). No deployment, operation, procurement or ownership is established, and a group’s figure is never divided among its sites.
Date. Date of the announcement, as the source gives it.
Record ID cpo-dc-stargate-aggregate-sept-2025