Cavalier's IEEE Spectrum article (June 2026) calculates that a 40 kW AI rack would need an 80-square-metre radiator in orbit.

One recorded claim. The claim panel gives its qualification, the source passages with their place in each source, and how it was checked.

What it connects

Why Thermodynamics Rules Future Orbital Data Centers → articulates → Heat rejection as a constraint on orbital compute