Claim and evidence Close ×
Task (4) of the 2024 data-centre plan sets the goal that by the end of 2025 a two-way computing–electricity coordination mechanism is initially formed and green electricity exceeds 80% for new data centres at national hub nodes, and encourages co-location of new data centres with renewable generation and pilots of direct green-power supply. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source
Provision Statement · provision ID cn-dc-plan-2024-task4 Subject version Notice and attached plan as posted on gov.cn · Published 2024-07-03 · Effective date not established Date 2024-07-03 · publication Stated dates (targets and terms, not events) target completion: end of 2025 Quantity more than · 80 % green electricity (as worded: 超过 80%) Scope and limits Targets set by the plan; whether they were met is not recorded. 'National hub nodes' are the hubs of the national integrated computing network.
The evidence 03 primary source Supports the claim
数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号 ↗ 中国政府网 (gov.cn), from the NDRC website · 2024-07-24 · In Simplified Chinese (zh-Hans)
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “到 2025 年底,算力电力双向协同机制初步形成,国家枢纽节点新建数据中心绿电占比超过 80%” Location in source 二、(四)提升可再生能源利用水平, PDF p. 3
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors 中国政府网 (gov.cn), from the NDRC website Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e). PDF attachment P020240724272072479001.pdf on gov.cn (file name dated 2024-07-24); the notice page gives 成文日期 2024年07月03日. Retrieved again at admission on 2026-10-30 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e, the same bytes). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language Simplified Chinese (zh-Hans) Attribution 中国政府网 (gov.cn), from the NDRC website, “数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号”, 2024-07-24. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (37 words, each CJK character counted as one) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. English machine translation, not verified by a person: “By the end of 2025, a two-way computing–electricity coordination mechanism will be initially formed, and green electricity will exceed 80% for new data centres at national hub nodes”. No human editorial review. primary source Supports the claim
数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号 ↗ 中国政府网 (gov.cn), from the NDRC website · 2024-07-24 · In Simplified Chinese (zh-Hans)
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “引导新建数据中心与可再生能源发电等协同布局” Location in source 二、(四), PDF p. 3
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors 中国政府网 (gov.cn), from the NDRC website Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e). PDF attachment P020240724272072479001.pdf on gov.cn (file name dated 2024-07-24); the notice page gives 成文日期 2024年07月03日. Retrieved again at admission on 2026-10-30 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e, the same bytes). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language Simplified Chinese (zh-Hans) Attribution 中国政府网 (gov.cn), from the NDRC website, “数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号”, 2024-07-24. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (21 words, each CJK character counted as one) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. English machine translation, not verified by a person: “guide new data centres to be sited in coordination with renewable generation and the like”. No human editorial review. primary source Supports the claim
数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号 ↗ 中国政府网 (gov.cn), from the NDRC website · 2024-07-24 · In Simplified Chinese (zh-Hans)
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “鼓励有关地区探索开展数据中心绿电直供” Location in source 二、(四), PDF p. 3
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors 中国政府网 (gov.cn), from the NDRC website Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e). PDF attachment P020240724272072479001.pdf on gov.cn (file name dated 2024-07-24); the notice page gives 成文日期 2024年07月03日. Retrieved again at admission on 2026-10-30 (SHA-256 30d310ed765d51abce62ecdaea1dc79d26fc3e1e3966432ce2c50e541480f39e, the same bytes). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language Simplified Chinese (zh-Hans) Attribution 中国政府网 (gov.cn), from the NDRC website, “数据中心绿色低碳发展专项行动计划 (Special Action Plan for the Green and Low-Carbon Development of Data Centres), attachment to 发改环资〔2024〕970号”, 2024-07-24. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (18 words, each CJK character counted as one) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. English machine translation, not verified by a person: “encourage the regions concerned to explore direct green-power supply to data centres”. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. An exact framework edition, or another document with an exact expression, states one provision: a capability threshold or risk level and its trigger, a required safeguard or action, a decision authority (who decides, recommends, can overrule or is informed), a stated exception, or another statement of its content, such as a licence term or a prospectus statement. The passage records what the document says, not implementation, compliance or effectiveness. Provisions with the same key align across editions of one family.
Date. Date of issue as the text gives it (the document date or date line), recorded as its date of publication as in earlier admissions; no signing event is shown.
Record ID cpo-pw-cn-dc-plan-green-power-2025