Claim and evidence Close ×
U.S. Nuclear Regulatory Commission recorded a regulator decision on ↓ Approval of a fuel licence amendment request for the Crane Clean Energy Center
Constellation stated on 6 August 2026 that the NRC had approved a fuel licence amendment request for the Crane Clean Energy Center, and that it was moving closer to restarting operations in 2027. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source; Context: primary · 1 source
Date 2026-08-06 · announcement Stated dates (targets and terms, not events) target operation: 2027 Scope and limits Rests on Constellation's report; the NRC approval document was not retrieved. A fuel licence amendment is one step; Constellation does not state that the plant operates. 2027 is a target that replaces the 2028 projection of September 2024.
The evidence 03 primary source Context only
Constellation Reports Second Quarter 2026 Results ↗ Constellation Energy · 2026-08-06
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “the NRC has approved a fuel license amendment request for the Crane Clean Energy Center — a major milestone moving us closer to restarting operations in 2027” Location in source Recent Developments and Second Quarter Highlights, first item
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Constellation Energy Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 345aca8aa3a138dc3f173e7598547f3f42ce67fd6d3115380c2b3bdcd7743bb5). Earnings release page as served on 2026-10-28; dateline Baltimore (Aug 6, 2026). Retrieved again at admission on 2026-10-30 (SHA-256 345aca8aa3a138dc3f173e7598547f3f42ce67fd6d3115380c2b3bdcd7743bb5, the same bytes). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Constellation Energy, “Constellation Reports Second Quarter 2026 Results”, 2026-08-06. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (26 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 34) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Crane Clean Energy Center (facility page) ↗ U.S. Nuclear Regulatory Commission · Publication date unknown
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “By Amendment No. 307, dated July 1, 2026, the NRC staff approved Constellation's request.” Location in source Other Licensing Actions, request of June 27, 2025
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors U.S. Nuclear Regulatory Commission Version Facility page retrieved at admission on 2026-10-30; the cross-family check read it on 2026-10-29. Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Attribution U.S. Nuclear Regulatory Commission, “Crane Clean Energy Center (facility page)”. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). The regulator’s own record (cross-family check, item 34). The quotation (14 words) matched a direct retrieval of 2026-10-30 (SHA-256 c7199e370c1ed0f9cb1e9cb6cf9f1ed55163224f693665b9b9965dfe358e7f37). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms. No human editorial review. primary source Supports the claim
Crane Clean Energy Center (facility page) ↗ U.S. Nuclear Regulatory Commission · Publication date unknown
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “receipt and possession of new nuclear fuel and new sealed neutron sources at the CCEC” Location in source Other Licensing Actions, request of June 27, 2025
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors U.S. Nuclear Regulatory Commission Version Facility page retrieved at admission on 2026-10-30; the cross-family check read it on 2026-10-29. Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Attribution U.S. Nuclear Regulatory Commission, “Crane Clean Energy Center (facility page)”. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). What the amended licence covers. The quotation (15 words) matched a direct retrieval of 2026-10-30 (SHA-256 c7199e370c1ed0f9cb1e9cb6cf9f1ed55163224f693665b9b9965dfe358e7f37). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. A regulator’s decision, dated by the regulator’s own record where it was retrieved and otherwise by the statement that reports it, which the record names. The decision covers only what its record states.
Date. Date of Constellation's statement; the date of the NRC action is not given in the release.
Record ID cpo-pw-crane-nrc-fuel-amendment