Federal Energy Regulatory Commission recorded a regulator decision on ↓ Rejection of the amended Susquehanna Interconnection Service Agreement (co-located load 300 MW to 480 MW)
FERC, by order issued on 1 November 2024 (189 FERC ¶ 61,078, Docket ER24-2172), rejected the amended Interconnection Service Agreement among PJM, Susquehanna Nuclear and PPL Electric Utilities, which would have increased the co-located load at the Susquehanna plant from 300 MW to 480 MW. World Nuclear News reported the rejection on 4 November 2024. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source; Context: secondary · 1 source
Date 2024-11-01 · publication Figure measures facility power Quantity exact · 480 MW co-located load (proposed, up from 300 MW) Scope and limits Dated by FERC’s own order (cross-family check, item 44); the press report is context. The order names Susquehanna Nuclear, LLC, not Talen; the report’s “Talen” is the corporate group. The 960 MW of the Cumulus campus is a separate figure, not the rejected load.
The evidence 07 secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “rejecting the amended Susquehanna Interconnection Service Agreement” Location in source paragraph beginning “The US Federal Energy Regulatory Commission…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (7 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 44) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase the agreement rejected is described as between PJM Interconnection, PPL Electric Utilities and Talen Energy Corporation.
Location in source paragraph beginning “The US Federal Energy Regulatory Commission…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The paraphrase is Selekoa’s, written from the text retrieved for the candidate pack on 2026-10-28; it is not a quotation and was not machine-matched. The cross-family check found it faithful. A cross-family machine check (2026-10-29/30, item 44) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “to increase from 300 MW to 480 MW the amount of load it is allowed to transfer from Susquehanna” Location in source paragraph beginning “PJM is the regional transmission organisation…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (19 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 44) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “FERC commissioners have now voted 2-1 against the proposal” Location in source paragraph beginning “FERC commissioners have now voted 2-1…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (9 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 44) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase the report quotes Talen as saying that the existing ISA allows for 300 MW of co-located load at Susquehanna.
Location in source Talen statement quoted in the report
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The paraphrase is Selekoa’s, written from the text retrieved for the candidate pack on 2026-10-28; it is not a quotation and was not machine-matched. The cross-family check found it faithful. A cross-family machine check (2026-10-29/30, item 44) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Order Rejecting Amended Interconnection Service Agreement, 189 FERC ¶ 61,078 (Docket ER24-2172) ↗ Federal Energy Regulatory Commission · 2024-11-01
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “to increase the amount of Co-Located Load from 300 megawatts (MW) to 480 MW” Location in source 189 FERC ¶ 61,078, PDF p. 1, paragraph 1
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Federal Energy Regulatory Commission Version Order PDF retrieved at admission on 2026-10-30 (SHA-256 69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934, the bytes the cross-family check retrieved). Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Attribution Federal Energy Regulatory Commission, “Order Rejecting Amended Interconnection Service Agreement, 189 FERC ¶ 61,078 (Docket ER24-2172)”, 2024-11-01. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). The regulator’s own order (cross-family check, item 44). The quotation (14 words) matched a direct retrieval of 2026-10-30 (SHA-256 69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms. No human editorial review. primary source Supports the claim
Order Rejecting Amended Interconnection Service Agreement, 189 FERC ¶ 61,078 (Docket ER24-2172) ↗ Federal Energy Regulatory Commission · 2024-11-01
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “In this order, we reject the Amended ISA.” Location in source 189 FERC ¶ 61,078, PDF p. 1, paragraph 1
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Federal Energy Regulatory Commission Version Order PDF retrieved at admission on 2026-10-30 (SHA-256 69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934, the bytes the cross-family check retrieved). Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Attribution Federal Energy Regulatory Commission, “Order Rejecting Amended Interconnection Service Agreement, 189 FERC ¶ 61,078 (Docket ER24-2172)”, 2024-11-01. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). The decision as the order states it. The quotation (8 words) matched a direct retrieval of 2026-10-30 (SHA-256 69b04b60cfc5f0150af8cb2f96eabca1c6af9ff74f8bbdbd41a2929b0bf69934). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. A regulator’s decision, dated by the regulator’s own record where it was retrieved and otherwise by the statement that reports it, which the record names. The decision covers only what its record states.
Date. Date the order was issued, as it states; the report is dated 4 November 2024.
Record ID cpo-pw-ferc-susquehanna-isa-rejected