Claim and evidence Close ×
Talen announced on 4 March 2024 the sale of its Cumulus data-centre campus in north-eastern Pennsylvania, connected to its Susquehanna nuclear plant; its release does not name the buyer, which Talen’s results of 14 March 2024 name as AWS, as the cross-family check read both. World Nuclear News later reported the 960 MW campus sold to AWS with a long-term power supply agreement. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 2 sources; Context: secondary · 1 source
Date 2024-03-04 · announcement Figure measures not stated by the source Stage announced Quantity exact · 960 MW (as worded: '960 MW Cumulus data centre campus') Scope and limits Talen’s releases rest on the cross-family check’s reading of Internet Archive captures; Talen’s investor site refused this admission (HTTP 403). The reported terms (minimum commitments ramping in 120 MW steps from 2025, a one-time option to cap at 480 MW) are the reporter’s account. The sale price is not recorded. Amazon described the arrangement in October 2024 (recorded separately).
The evidence 05 secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “the sale of its 960 MW Cumulus data centre campus in northeast Pennsylvania to Amazon Web Services (AWS)” Location in source paragraph beginning “In March, Talen announced the sale…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (18 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 43) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase the report says the sale came with a long-term agreement to provide power from Talen's Susquehanna plant, to which the Cumulus campus is directly connected.
Location in source paragraph beginning “In March, Talen announced the sale…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The paraphrase is Selekoa’s, written from the text retrieved for the candidate pack on 2026-10-28; it is not a quotation and was not machine-matched. The cross-family check found it faithful. A cross-family machine check (2026-10-29/30, item 43) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. secondary source Context only
Regulator rejects amended Susquehanna power agreement ↗ World Nuclear News (World Nuclear Association) · 2024-11-04
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase AWS planned a 960 MW data centre at the site, with minimum contractual power commitments ramping up in 120 MW increments from 2025 and a one-time option to cap commitments at 480 MW.
Location in source paragraph beginning “AWS plans to develop a 960 MW…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors World Nuclear News (World Nuclear Association) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 44d869b272190ea91a35701bcad5dddd13b8001af54aa3a23b7ca7d6684b1b04). Article as served on 2026-10-28; article:published_time 2024-11-04. The FERC order itself could not be retrieved (www.ferc.gov HTTP 403). Retrieved again at admission on 2026-10-30 (SHA-256 1091501c35b47a4a47fd96f153c71bf48af1168395d2586f08746fa91718a8aa). Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution World Nuclear News (World Nuclear Association), “Regulator rejects amended Susquehanna power agreement”, 2024-11-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The paraphrase is Selekoa’s, written from the text retrieved for the candidate pack on 2026-10-28; it is not a quotation and was not machine-matched. The cross-family check found it faithful. A cross-family machine check (2026-10-29/30, item 43) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Talen Energy Announces Sale of Zero-Carbon Data Center Campus ↗ Talen Energy (ir.talenenergy.com) · 2024-03-04
Archived copy, captured 2024-08-29: Talen Energy Announces Sale of Zero-Carbon Data Center Campus ↗
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase Talen announces the sale of its Cumulus data-centre campus, connected to the Susquehanna plant; the release does not name the buyer.
Location in source release of 4 March 2024
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Talen Energy Version Not read at admission: the address answered HTTP 403 and the Internet Archive refused this admission. The cross-family check (2026-10-29) read the capture linked here; the paraphrase rests on that reading. Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Archive copy Open archived copy, captured 2024-08-29: Talen Energy Announces Sale of Zero-Carbon Data Center Campus ↗ . Captured 178 days after the recorded publication date. An archive copy shows only what the archive retrieved on 2024-08-29. It does not prove what the page said earlier, and it can differ from the copy checked on 2026-10-30.Attribution Talen Energy, “Talen Energy Announces Sale of Zero-Carbon Data Center Campus”, 2024-03-04. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). Talen’s own release, as the cross-family check read it in an Internet Archive capture; not read at admission. The paraphrase is Selekoa’s; it is not a quotation and was not machine-matched. No human editorial review. primary source Supports the claim
Talen Energy results release of 14 March 2024 ↗ Talen Energy (ir.talenenergy.com) · 2024-03-14
Archived copy, captured 2026-01-29: Talen Energy results release of 14 March 2024 ↗
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Paraphrase Talen’s results release names Amazon Web Services as the buyer of the Cumulus campus.
Location in source results release of 14 March 2024
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Talen Energy Version Not read at admission. The cross-family check (2026-10-29) read the Internet Archive capture linked here, which is of January 2026; the paraphrase rests on that reading. Canonical address Open the canonical source ↗ Accessed 2026-10-30 Language English (en) Archive copy Open archived copy, captured 2026-01-29: Talen Energy results release of 14 March 2024 ↗ . Captured 686 days after the recorded publication date. An archive copy shows only what the archive retrieved on 2026-01-29. It does not prove what the page said earlier, and it can differ from the copy checked on 2026-10-30.Attribution Talen Energy, “Talen Energy results release of 14 March 2024”, 2024-03-14. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Added at the admission of the compute, power and orbit pack (research/compute-power-orbit). Talen’s results, as the cross-family check read them in an Internet Archive capture; not read at admission. The paraphrase is Selekoa’s; it is not a quotation and was not machine-matched. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. A stated agreement on electricity supply, a power purchase, a plant restart or the development of generation, at the stage the parties state. It is not delivery of power, and an agreement to explore is not a contract.
Date. Date of Talen’s release, as the cross-family check read it in a capture.
Record ID cpo-pw-talen-aws-cumulus-sale