Claim and evidence Close ×
Emirates News Agency (WAM) announced plan ↓ UAE–US AI Campus, Abu Dhabi, to use nuclear, solar and gas power
WAM reported on 15 May 2025 that the 5 GW UAE–US AI Campus in Abu Dhabi, once completed, will use nuclear, solar and gas power to minimise carbon emissions. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source
Date 2025-05-15 · announcement Scope and limits A stated plan reported by the state news agency, not a government energy measure or a power agreement; no generator, supply contract or share of each source is named. The campus itself belongs to the data-centre strand. No Gulf government text addressing energy for AI compute was located (see omissions).
The evidence 02 primary source Supports the claim
UAE, US Presidents attend unveiling of Phase 1 of new 5GW AI campus in Abu Dhabi ↗ Embassy of the United Arab Emirates in Washington, DC (reprinting WAM) · 2025-05-15
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “Once completed, the facility will leverage nuclear, solar, and gas power to minimise carbon emissions” Location in source paragraph beginning “Once completed, the facility will leverage…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Embassy of the United Arab Emirates in Washington, DC (reprinting WAM) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 376f7cf48c16d123d9632d8c9195b7850397f6d93063854d201df6f41f5fd0d8). Embassy page reprinting the WAM report (dateline ABU DHABI, 15th May, 2025 (WAM)); the wam.ae page is a script-rendered shell that returned no text. Retrieved again at admission on 2026-10-30 (SHA-256 376f7cf48c16d123d9632d8c9195b7850397f6d93063854d201df6f41f5fd0d8, the same bytes). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Embassy of the United Arab Emirates in Washington, DC (reprinting WAM), “UAE, US Presidents attend unveiling of Phase 1 of new 5GW AI campus in Abu Dhabi”, 2025-05-15. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (15 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. No human editorial review. primary source Supports the claim
UAE, US Presidents attend unveiling of Phase 1 of new 5GW AI campus in Abu Dhabi ↗ Embassy of the United Arab Emirates in Washington, DC (reprinting WAM) · 2025-05-15
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “The UAE-US AI campus will include 5GW of capacity for AI data centres in Abu Dhabi” Location in source paragraph beginning “The UAE-US AI campus will include…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Embassy of the United Arab Emirates in Washington, DC (reprinting WAM) Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 376f7cf48c16d123d9632d8c9195b7850397f6d93063854d201df6f41f5fd0d8). Embassy page reprinting the WAM report (dateline ABU DHABI, 15th May, 2025 (WAM)); the wam.ae page is a script-rendered shell that returned no text. Retrieved again at admission on 2026-10-30 (SHA-256 376f7cf48c16d123d9632d8c9195b7850397f6d93063854d201df6f41f5fd0d8, the same bytes). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Embassy of the United Arab Emirates in Washington, DC (reprinting WAM), “UAE, US Presidents attend unveiling of Phase 1 of new 5GW AI campus in Abu Dhabi”, 2025-05-15. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (16 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval whose SHA-256 equals the pack’s. Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. A party announced a plan, programme or intention, dated by the announcement. A plan is not an action, a contract or spending.
Date. WAM dateline as reprinted by the UAE Embassy in Washington.
Record ID cpo-pw-uae-campus-energy-mix