Institutional dossier

Crusoe

Built from the same claims and evidence as the map.

Institutional dossier

The documented history of Crusoe: chronology, people, research, capital and compute, and governance. Every statement opens its source and its limits.

Records dated 2025-03-18 to 2026-03-27 · 0 undated

3 claims · 2 sources · 3 not editorially accepted. The counts describe this selection. They do not measure completeness or independent confirmation.

Scope, evidence and limits

Description: US data-centre developer and AI cloud provider (Crusoe Energy Systems).

The records are grouped automatically. No human inspection of the selected claims, source paths or framing is recorded for this dossier. Each source passage shows how it was checked.

The dossier is computed from existing records. It is not a continuous history of the institution, and a missing record does not mean that an event or relationship did not happen. The chronology uses the dates of events and reports, not the date the public could first have known of them. Later sources can describe earlier events.

Select any statement to see its exact claim, qualification, date note, evidence passage, location in the source, source version and review status. The description above is Selekoa’s stored description of the institution, based on these sources:

Chronology

Records about the institution itself and documented changes to its frameworks, by year. Expand a year to read the claims. People’s other institutional records and related documents have their own sections. Where a date gives only the year or month, the order within it is unknown.

2025Record year · 1 claims
  1. 2025-03-18 · announcementcompute
    Crusoe stated that with the second phase its Abilene facility would total eight buildings and a total power capacity of 1.2 gigawatts.Crusoe → planned capacity for → Crusoe AI data center, Lancium Clean Campus, Abilene, TexasInspect claim & evidence ↗

    Record about this institution · Stated in source · Supported

    Stage: planned · exact 1.2 GW (as worded: "a total power capacity of 1.2 gigawatts (GW)")

    Qualification and date notes

    Planned total power capacity of the campus; the release separately refers to "the 1.2 GW grid interconnection" in Lancium's power plan. Neither figure is IT load or compute delivered. Crusoe states construction of the second phase had begun and expected completion in mid-2026, a target; its 27 March 2026 release gives completion of the second phase "by the end of 2026".

    Date of the announcement, as the source gives it.

2026Record year · 2 claims
  1. 2026-03-27 · announcementcompute
    Crusoe stated that the new campus brings the total projected capacity across the full Abilene site to 2.1 gigawatts.Crusoe → planned capacity for → Full Abilene site (existing campus and new Microsoft campus, combined) Inspect claim & evidence ↗

    Record about this institution · Stated in source · Supported

    Stage: planned · exact 2.1 GW (as worded: "total projected capacity across the full Abilene site")

    Qualification and date notes

    Crusoe's own projected aggregate for its Abilene site; not built capacity and not a figure for either campus.

    Date of the announcement, as the source gives it.

  2. 2026-03-27 · announcementcompute
    Crusoe announced on 27 March 2026 a new 900 MW AI factory campus in Abilene, adjacent to its existing campus, to support large-scale AI workloads for Microsoft, with land clearing underway and the first building expected to be energized in mid-2027.Crusoe → announced site → Crusoe 900 MW AI factory campus for Microsoft, Abilene, TexasInspect claim & evidence ↗

    Record about this institution · Stated in source · Supported

    Stage: announced · exact 900 MW (as worded: "the 900 MW site")

    Qualification and date notes

    An announced development, with site preparation stated as underway; no contract terms with Microsoft are stated beyond the support relationship. The 900 MW is also the stated size of the on-site power plant, and each of the two buildings is stated as designed for 336 MW of critical IT load (design figures, not operating capacity).

    Date of the announcement, as the source gives it.