Claim and evidence Close ×
Amazon announced on 19 October 2026 that it, X-energy and AEP had signed an agreement to explore deploying twelve Xe-100 small modular reactors in Indiana, adding 960 MW to serve the regional grid and Amazon's data centers, with Amazon serving as project development funder and stated to be the first customer to purchase power from the plant once operational. Copy claim link
Copy claim reference
Machine-checked, not reviewed by an editor Stated in source Supported
Supporting evidence: primary · 1 source
Date 2026-10-19 · announcement Figure measures generation capacity Stated dates (targets and terms, not events) target operation: collaboration target, >5 GW (2039) Stage announced Quantity exact · 960 megawatts (MW) Scope and limits An agreement to explore; Amazon's funding amount is not stated and no construction is recorded. Amazon describes the project as the second under a collaboration with X-energy aiming at more than 5 GW by 2039, a target.
The evidence 04 primary source Supports the claim
Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana ↗ Amazon · 2026-10-19
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “Amazon, X-energy, and American Electric Power (AEP) have signed an agreement to explore deploying X-energy’s small modular reactor (SMR) technology in Indiana” Location in source paragraph beginning “Amazon, X-energy, and American Electric Power…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Amazon Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 82a5ba47dc2b1caa8ff0726c8117c5f547dcf79290b80b70c876d06bc7236780). aboutamazon.com page as served on 2026-10-28; datePublished 2026-10-19 in page metadata. Retrieved again at admission on 2026-10-30 (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Amazon, “Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana”, 2026-10-19. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (22 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 32) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana ↗ Amazon · 2026-10-19
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “target building 12 of X-energy's Xe-100 SMRs, which would add 960 megawatts (MW) of new, carbon-free energy that would serve both the regional power grid and Amazon’s data centers” Location in source paragraph beginning “Amazon, X-energy, and American Electric Power…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Amazon Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 82a5ba47dc2b1caa8ff0726c8117c5f547dcf79290b80b70c876d06bc7236780). aboutamazon.com page as served on 2026-10-28; datePublished 2026-10-19 in page metadata. Retrieved again at admission on 2026-10-30 (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Amazon, “Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana”, 2026-10-19. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (29 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 32) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana ↗ Amazon · 2026-10-19
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “Amazon is serving as a project development funder and would be the first customer to purchase power from the plant once operational” Location in source paragraph beginning “Amazon is serving as a project…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Amazon Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 82a5ba47dc2b1caa8ff0726c8117c5f547dcf79290b80b70c876d06bc7236780). aboutamazon.com page as served on 2026-10-28; datePublished 2026-10-19 in page metadata. Retrieved again at admission on 2026-10-30 (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Amazon, “Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana”, 2026-10-19. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (22 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 32) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. primary source Supports the claim
Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana ↗ Amazon · 2026-10-19
Copy source reference
Cite the original source Cite the original document, not Selekoa. Check these details against it.
Copy APA
Download BibTeX Download RIS Download CSL-JSON
Source excerpt “add more than 5 gigawatts (GW) of new nuclear capacity to the U.S. grid by 2039” Location in source paragraph beginning “This marks the second project under…”
How it was read Retrieved directly from the publisher
Machine-checked · 2026-10-30
Source details and check notes Authors Amazon Version Retrieved for the candidate pack on 2026-10-28 (SHA-256 82a5ba47dc2b1caa8ff0726c8117c5f547dcf79290b80b70c876d06bc7236780). aboutamazon.com page as served on 2026-10-28; datePublished 2026-10-19 in page metadata. Retrieved again at admission on 2026-10-30 (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7). Its wording can change; earlier wording is not authenticated. Canonical address Open the canonical source ↗ Accessed 2026-10-28 Language English (en) Attribution Amazon, “Amazon invests in nuclear energy project targeting nearly 1 gigawatt of carbon-free energy for Indiana”, 2026-10-19. Reuse No open redistribution licence asserted. Bibliographic metadata, editorial paraphrases and short attributed quotations (at most 50 words each). Recheck terms before wider redistribution. Check notes Candidate pack passage, compute, power and orbit (research/compute-power-orbit). The quotation (16 words) matched the text retrieved for the candidate pack on 2026-10-28 and again at admission on 2026-10-30, in a fresh retrieval (SHA-256 b76d414bbfdde7fa4a327a0fe9fbe0e9d81e591e471175ee18b6c05cc43730a7; the bytes differ from the pack’s retrieval). Matching ignored differences of whitespace, case, quotation marks, dashes and Unicode compatibility forms, so the source’s typography can differ. A cross-family machine check (2026-10-29/30, item 32) answered the record’s question blind from fresh retrievals and agreed with the record. No human editorial review. Status and meaning Editorial status. Not reviewed by an editor . An exploratory record that no editor has accepted. This status does not say whether a person has read any linked passage. Each evidence record above shows how it was checked.
Relation. A stated agreement on electricity supply, a power purchase, a plant restart or the development of generation, at the stage the parties state. It is not delivery of power, and an agreement to explore is not a contract.
Date. Date from the page's article:published_time metadata (2026-10-19); the page text shows no date.
Record ID cpo-pw-amazon-xenergy-aep-indiana